EKO-INWEST S.A.

industry_1 Energetics

industry_0
LPG terminals | bio-fuel producing installations | geothermal resources

Under services rendered related to project implementation we offer: 
 

  • designing of water and sewage networks and systems,
  • verification of technical documentation,
  • preparation of terms of reference for construction works,
  • organisation of tender procedures,
  • preparation and monitoring of working and financial schedules (MS Project)
  • site supervision in all engineering fields,
  • checking of priced bill of quantities for additional and replacement works,
  • participation in the process start-up,
  • final acceptance of the project and its hand-over for use,
  • financial settlement of the project.
default-img_0

Work done during the renovation of the average boiler No 7 and 8 in the Dolna Odra Power Plant in the scope:insulation, construction, cleaning and construction of scaffolding

Category: 
Energetics
big_27_201303190855421

Construction of the Flue Gas Desulfurization System for Power Units 5 and 6 in the Dolna Odra Power Plant

Function: 
Contract Engineer
Category: 
Energetics
big_kociol_201209171120161

Construction of the Boiler Generating Energy from Biomass in the Szczecin Power Plant

Function: 
Contract Engineer
Category: 
Energetics
default-img_0

Modernization of combustion installation (boilers No 6 and 7) in Dolna Odra Power Plant in order to reduce NOx

Function: 
Contract Engineer
Category: 
Energetics
dsc05174_1

Construction of gas pipeline DN 800 Świnoujście-Szczecin

Category: 
Energetics
dscn2078

Construction of the Waste Incineration Plant for the Bydgoszcz and Toruń metropolitan region

Function: 
Contract Engineer
Category: 
Energetics
big_7_200911201048131

Construction of the Sugar Silo with a Capacity of 50 tonnes for the Kluczewo Sugar Factory in Stargard Szczeciński

Category: 
Energetics